Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
游戏狗三国杀官网合作专区
山东润达无缝钢管厂
太湖字谜网
hg皇冠
hg皇冠
Video-game-platform-marketing@cornelltheshooter.net
澄城在线
澳门银河网上赌场
利记
网赌平台
线上赌博平台
深圳五洲医院针灸推拿科
昆明信息港新闻
聚焦鹏城
yyqq音乐网
光山网
中国教育在线小学频道